EV charger installation for homes and workplaces
Surveyed properly, installed on a dedicated protected circuit and certified on completion — across Cardiff, Penarth, Barry, Newport and the wider South Wales area.

Home charger installation
Overnight charging on a dedicated circuit, positioned so the cable reaches without crossing a walkway, and configured so your supply is never overloaded.
- 7.4kW single-phase units
- Tethered or untethered
- Ducted driveway cable routes
- Garage & outbuilding feeds
- Solar-aware charging setups
- App & tariff configuration
Workplace and fleet charging
From two staff bays to a multi-bay car park with metering, access control and dynamic load management so charging never affects site operations.
- Multi-bay installations
- Three-phase 22kW where supply allows
- Metering & usage reporting
- Access control for staff or visitors
- Dynamic load management
- Maintenance and support cover
Safe, dedicated circuit
A charge point draws near-maximum current for hours. It needs its own correctly protected circuit — not a spur off a socket ring.
Load management built in
Dynamic load balancing prevents the charger from competing with showers, ovens and heat pumps for supply capacity.
Correct earthing protection
PEN fault protection is designed in, either within the charge point or by an earth-rod arrangement where needed.
Specified for your vehicle
There's no benefit paying for 22kW if your car accepts 7.4kW. We specify around the vehicle, not the sales sheet.
Will a charge point work at your property?
Three things decide it: your supply capacity, your earthing arrangement and the route from the board to the parking space. We check all three before quoting.
Vehicle compatibility
Universal Type 2 connections suit virtually every current EV and plug-in hybrid; we confirm your car's on-board charger rating first.
Supply capacity
Where the main fuse is tight, load-managed units throttle charging automatically instead of tripping the property.
Property type
Houses, flats with allocated bays, offices and industrial units all have different constraints — the survey covers yours.
How an EV installation runs
Five stages, each confirmed with you before the next one starts.
1. Supply & capacity check
Main fuse rating, earthing arrangement and existing demand assessed before anything is quoted.
2. Route and position survey
Cable route, containment, drilling points and charge-point position agreed with you on site or from photos.
3. Fixed quotation
Charge point model, cable length, containment and any supply upgrade itemised in writing.
4. Installation day
Dedicated protected circuit, tidy containment, ducting where needed and commissioning of the unit.
5. Certification & handover
Electrical Installation Certificate, app setup, load-management configuration and warranty registration.
DemoGrant availability, pricing and installation timings shown here are placeholders for this demonstration site.
EV charging questions, answered
Step 1 of 5 — Service
20%
Thinking about an EV charge point?
Send your postcode, vehicle and parking arrangement and we'll confirm what your supply will support.